Florida Underground and Aerial Fiber Contractor Licensing

Reviewed by Michael Schaeffer · Last verified November 18, 2026

Researched November 2026 · All Florida work types

What license do fiber contractors need in Florida? Florida's contractor license rule: Not needed for line-only scope (CILB license applies to building/civil scope). Confirm fiber specifics with the boards below.

What's different about Florida

  • Florida's storm work rules come from Fla. Stat. 213.055. Out of state businesses doing emergency work on infrastructure, or working under a utility mutual aid agreement, aren't subject to state registration, licensing or filing for the disaster response period, and their out of state employees don't need state or local occupational licenses.
  • Florida's Electrical Contractors' Licensing Board has no reciprocity agreements.
  • Unlicensed electrical contracting is a first-degree misdemeanor, and a repeat offense, or any offense during a declared state of emergency, is a third-degree felony.

Sources: Fla. Stat. 213.055 · FL ECLB exam endorsement list · F.S. 489.531 · FL ECLB FAQ (exemptions)

Underground and Aerial Fiber work covers aerial work (make ready, strand, lashing fiber to existing poles, splicing) and underground work (directional boring, microtrenching, conduit, handholes and vaults) for broadband and telecom networks. What it includes and how it's licensed nationally ›

Florida contractor license rule

Not needed for line-only scope (CILB license applies to building/civil scope).

Electrical licensing and fiber

For power work, Florida requires: Certified electrical contractor; for line work the Utility Line Electrical Contractor specialty (ECLB). Ask the board whether that reaches fiber.

Official Florida licensing boards

How to apply in Florida

Electrical: ECLB 8 exam application then ECLB 1 initial license. GC: pass state exam then CILB 5-A application

Licensed in another state? See Florida electrical license reciprocity.

Emergency and storm work in Florida

Waiver in state law

Out of state businesses doing emergency work on infrastructure, or working under a utility mutual aid agreement, aren't subject to state registration, licensing or filing for the disaster response period, and their out of state employees don't need state or local occupational licenses. DBPR also issues emergency orders for each storm.

Law: Fla. Stat. 213.055. Triggered by: Governor's executive order; DBPR emergency orders follow it.

The mutual aid period can start before a declaration when a utility brings crews in ahead of a storm. Check the DBPR emergency page for storm specific orders.

Utility line work in Florida normally needs an electrical contractor license. The disaster law is what lets qualifying out of state crews work without it during the declared period.

Sources: Fla. Stat. 213.055 · DBPR emergency information page

Compare every state: emergency and storm work licensing by state ›

Co-ops and public power in Florida

Florida has 16 electric co-ops and 32 city, district or other public power utilities. The largest: JEA, Orlando Utilities Comm, Withlacoochee River Elec Coop, Lee County Electric Coop, Inc, Sumter Electric Coop, Inc. G&T co-ops based here: Seminole Electric Cooperative. We have vendor registration guides for 5 of them. Most smaller co-ops keep their own bidder lists, so call their operations or engineering manager.

See every Florida co-op and public power utility ›

Who hires fiber crews in Florida

The largest electric utilities in Florida by customers: Florida Power & Light Co (5,905,174 customers); Duke Energy Florida, LLC (2,009,464 customers); Tampa Electric Co (849,876 customers); JEA (531,883 customers); Orlando Utilities Comm (282,182 customers); Withlacoochee River Elec Coop (259,639 customers). All 52 Florida utilities ›

Insurance for fiber crews · limits by utility

TAKKEL Insurance SponsoredGet fiber contractor insurance quotes in Florida
Coverage for fiber crews working in Florida.
Start a quote ›

Common questions

Do fiber contractors need a state license in Florida?
For fiber construction in Florida, start with the contractor license rule: Not needed for line-only scope (CILB license applies to building/civil scope). Ask the Florida board how it treats telecom and low voltage work.
Do I need to call 811 before boring fiber in Florida?
Yes. Florida's one call law requires fiber crews to call 811 and wait for locates before boring or trenching.

See all 52 electric utilities in Florida with links to their websites.

Other Florida work types

Same work type in other states: Underground and Aerial Fiber licensing in all 50 states and DC

Statutes and research sources

Research to plan from, not legal advice. Confirm with the Florida board before bidding.

Report an error on this page