TAKKEL
Utility ContractorLicensing Map
Line, underground and fiber contractor licensing by state · researched November 2026

Tennessee Utility Contractor Licensing

Reviewed by Michael Schaeffer · Last verified November 18, 2026

Electric line work in Tennessee at a glanceWorking directly for the electric utility: Yes: a contractor/GC license.
Other work: Yes: a contractor/GC license. This utility exemption needs confirmation with the board.

What's different about Tennessee

  • Tennessee's storm work rules come from Tenn. Code 58-2-201 to 58-2-205. Responding out of state businesses doing disaster work on critical infrastructure don't establish a presence that would subject them to state licensing or registration requirements or state and local taxes during the disaster response period.
  • Tennessee's agreements are trade exam waivers only: an electrical contractor licensed by exam in Alabama, Georgia, Louisiana, Mississippi, North Carolina, Ohio or West Virginia (or with the NASCLA exam) can skip the CE trade exam but still takes Tennessee's Business and Law exam and gets a Tennessee license.
  • You must hold a license with a high enough monetary limit when you offer to do the project, so a license is required before bidding (T.C.A. 62-6-103).

Sources: Tenn. Code 58-2-204 · TN Board for Licensing Contractors webinar, Feb 2026 (waiver agreements) · T.C.A. 62-6-103 · TN Board for Licensing Contractors

Pick your work type

  • Overhead Distribution: Overhead distribution work covers the pole lines that carry power from substations to homes and businesses.
  • Overhead Transmission: Overhead transmission work covers the high voltage lines that move power between generating plants and substations.
  • Underground Utility: Underground utility work covers buried power distribution.
  • Underground and Aerial Fiber: Fiber construction covers aerial work (make ready, strand, lashing fiber to existing poles, splicing) and underground work (directional boring, microtrenching, conduit, handholes and vaults) for broadband and telecom networks.
  • Line Clearance and Tree Trimming: Line clearance covers utility vegetation management.
  • Substation: Substation work covers the yards where voltage is stepped up or down.

What Tennessee requires

Contractor / GC license
Contractor license (Board for Licensing Contractors) with an electrical (CE) classification for projects of $25,000+; 'public utility structure' is in the definition.
Electrical contractor license
No separate firm license: CE is a contractor classification (LLE below $25,000).

License quick facts

Contractor / GC
License classContractor license (Board for Licensing Contractors) with the electrical (CE) or utility classification, for projects of $25,000 and up
Fees$250 application (2 year license); $200 renewal
ExamYes: Tennessee business and law, plus the trade exam
ExperienceBoard reviews experience with the financial statement to set a monetary limit
RenewalEvery 2 years
Continuing educationNone
Processing timeBoard meets every other month
Required insuranceGeneral liability set by monetary limit, workers' comp, and a CPA financial statement
ApplyApply ›

Fees and rules change, so check the board's site before you apply. Sources: TN license fees; TN contractor application booklet; How to become a licensed contractor

License bond

Tennessee requires a bond for a contractor or electrical contractor license only in some cases. Tennessee license bond details ›

Working directly for a power utility

The contractor definition covers public utility structures and we found no exemption for utility contractors. Confirm the right classification with the board.

Official Tennessee licensing boards

How to apply in Tennessee

Apply online at core.tn.gov; $250 fee; Business and Law exam for all; MU Municipal Utility and HC Heavy classifications also exist

Electrical license reciprocity in Tennessee

Trade exam waiver only Tennessee's agreements are trade exam waivers only: an electrical contractor licensed by exam in Alabama, Georgia, Louisiana, Mississippi, North Carolina, Ohio or West Virginia (or with the NASCLA exam) can skip the CE trade exam but still takes Tennessee's Business and Law exam and gets a Tennessee license. Tennessee electrical reciprocity details ›

Why licensing matters in Tennessee

When you need the license
Before you bid
Penalties for unlicensed work
You must hold a license with a high enough monetary limit when you offer to do the project, so a license is required before bidding (T.C.A. 62-6-103). Unlicensed contracting is a Class A misdemeanor (62-6-120).
Getting paid
An unlicensed contractor can recover only actual documented expenses, proven by clear and convincing evidence, with no profit, and can't file a mechanic's lien (62-6-103).

Statutes:

These rules apply when a license is required. Check the utility exemption above, and see penalties and bid timing in every state.

Emergency and storm work in Tennessee

Waiver in state law

Responding out of state businesses doing disaster work on critical infrastructure don't establish a presence that would subject them to state licensing or registration requirements or state and local taxes during the disaster response period.

Law: Tenn. Code 58-2-201 to 58-2-205. Triggered by: Governor's proclaimed state of emergency.

Businesses that stay after the disaster response period lose the protection.

Utility line work in Tennessee normally needs a contractor/GC license. The disaster law is what lets qualifying out of state crews work without it during the declared period.

Sources: Tenn. Code 58-2-204 · Tenn. Code 58-2-202 (definitions)

Compare every state: emergency and storm work licensing by state ›

TAKKEL Insurance SponsoredUtility contractor insurance in Tennessee
Workers' comp, general liability, fleet, equipment and umbrella for distribution, transmission, underground and fiber contractors.
Start a quote ›

Co-ops and public power in Tennessee

Tennessee has 25 electric co-ops and 60 city, district or other public power utilities. The largest: Nashville Electric Service, City of Memphis, Middle Tennessee E M C, Knoxville Utilities Board, City of Chattanooga. We have vendor registration guides for 5 of them. Most smaller co-ops keep their own bidder lists, so call their operations or engineering manager.

See every Tennessee co-op and public power utility ›

Utility supplier portals in Tennessee (8)

Where to register as a contractor or supplier with utilities that serve Tennessee: investor owned utilities, public power and co-ops. Each link explains the portal, how registration works and what to have ready.

UtilityPlatformHow to get in
Appalachian PowerSAP Ariba (aep.supplier.ariba.com)Open registration
Kingsport PowerSAP Ariba (aep.supplier.ariba.com)Open registration
EPBEPB Supplier PortalOpen registration
Knoxville Utilities BoardBidNet DirectPublic bids and prequalification
Memphis Light, Gas and WaterMLGW iSupplier Portal and Bid Notification ServiceOpen registration
Middle Tennessee ElectricMTE RFP page (email submission)Public RFPs
Nashville Electric ServiceNES My Vendor AccountOpen registration
Tennessee Valley AuthorityTVA supplier registration formOpen registration

Co-ops and city utilities: see every co-op and public power utility in Tennessee.

Electric utilities in Tennessee (87)

Every electric utility that serves customers in Tennessee, grouped by ownership and sorted by number of customers. These are the utilities that hire line, underground and fiber contractors. Names link to the utility's website where we have a working one.

Investor owned utilities (2)
Electric cooperatives (25)
Municipal and public power utilities (60)
UtilityCustomersRegister to bid
Nashville Electric Service463,455Supplier portal ›
City of Memphis423,338Supplier portal ›
Knoxville Utilities Board219,297Supplier portal ›
City of Chattanooga189,171Supplier portal ›
City of Clarksville85,314
Johnson City84,109
City of Lenoir77,358
Sevier County Electric System63,506
City of Greeneville40,569
City of Dickson38,982
City of Jackson38,719
Columbia Power System36,577
City of Bristol34,442
City of Cleveland34,348
City of Alcoa Utilities32,727
City of Clinton31,346
City of Elizabethton27,053
City of Gallatin26,963
City of Lexington23,584
City of Newport23,484
City of LaFollette23,354
Maryville Utilities23,073
City of Paris22,824
City of Lawrenceburg21,838
Weakley County Mun Elec Sys20,893
City of Cookeville19,787
City of Fayetteville19,465
City of Oak Ridge17,831
City of Morristown16,509
Carroll County15,571
City of Rockwood15,435
City of Pulaski15,323
Loudon Utilities Board14,637
Athens Utility Board14,126
City of Dyersburg12,075
City of Shelbyville11,746
Bolivar Energy Authority11,449
City of Dayton11,414
City of Harriman11,322
Tullahoma Board-Public Utils11,295
Benton County10,664
City of Sweetwater9,870
City of Springfield9,144
Town of Erwin9,008
City of Milan8,534
McMinnville Electric System8,307
City of Winchester6,835
City of Ripley6,663
City of Lewisburg6,662
City of Union City6,483
City of Brownsville5,421
City of Etowah5,360
City of Covington4,713
City of Humboldt4,585
City of Mt Pleasant4,294
City of Sparta3,092
City of Smithville3,051
City of Trenton2,463
City of Jellico2,290
City of Newbern1,836

Source: U.S. Energy Information Administration, Form EIA-861 (2024 data). Customer counts are for Tennessee only. Website links checked November 2026; 21 of 87 have a working link on file.

Common questions

How long does a Tennessee electrical contractor license last?
Tennessee doesn't issue a separate electrical contractor license; electrical and line work falls under the Contractor license (Board for Licensing Contractors) with the electrical (CE) or utility classification, for projects of $25,000 and up. The Tennessee contractor license renews every 2 years, so put the date on your calendar and renew before it lapses.
How much does a Tennessee electrical contractor license cost?
Tennessee doesn't issue a separate electrical contractor license; electrical and line work falls under the Contractor license (Board for Licensing Contractors) with the electrical (CE) or utility classification, for projects of $25,000 and up. State fees for the contractor license: $250 application (2 year license); $200 renewal. Bond, insurance and exam vendor fees are extra.
Do out-of-state line crews need a license for storm restoration in Tennessee?
Usually not during the declared disaster period. Responding out of state businesses doing disaster work on critical infrastructure don't establish a presence that would subject them to state licensing or registration requirements or state and local taxes during the disaster response period. Trigger: Governor's proclaimed state of emergency. Utility line work in Tennessee normally needs a contractor/GC license. The disaster law is what lets qualifying out of state crews work without it during the declared period.

Statutes and research sources

This is research to plan from, not legal advice. Licensing rules change and cities and counties can add their own licenses; every state also expects business registration, workers' comp and tax filings. Confirm with the board before bidding.

Report an error on this page