Georgia Overhead Distribution Contractor Licensing

Reviewed by Michael Schaeffer · Last verified November 18, 2026

Researched November 2026 · All Georgia work types

Do overhead distribution line contractors need a state license in Georgia? Working directly for the electric utility: Yes: a contractor/GC license.
Customer, developer or other non utility work: Yes: a contractor/GC license and an electrical contractor license. The utility exemption here isn't settled in the statute text, so confirm with the board before relying on it.

What's different about Georgia

  • Georgia's storm work rules come from O.C.G.A. 48-2-100. Out of state businesses working on infrastructure for a declared disaster aren't required to meet state or local business licensing or registration requirements or file most state taxes during the disaster period.
  • Georgia's Board of Electrical Contractors says it does not offer licensure by reciprocity (effective May 2026), after electrical licensing moved under the State Construction Industry Licensing Board.
  • Georgia's general contractor law makes the contract unenforceable rather than setting a separate fine in that section.

Sources: O.C.G.A. 48-2-100 · GA Board of Electrical Contractors FAQ · O.C.G.A. 43-41-17 · O.C.G.A. 43-14-13 (prior text)

Overhead Distribution work covers the pole lines that carry power from substations to homes and businesses. What it includes and how it's licensed nationally ›

What Georgia requires

Contractor / GC license
General contractor license for commercial work over $2,500 (Ch. 41); specialty-trade work may be exempt.
Directly for utility: Required   Other work: Required
Electrical contractor license
Electrical Contractor Class I/II (Ch. 14, reorganized under the State Construction Industry Licensing Board July 1, 2026).
Directly for utility: Not required   Other work: Required

License quick facts Confirm with the board

Electrical contractorContractor / GC
License classElectrical Contractor Class II (Unrestricted)General Contractor (Unlimited or Limited Tier), for commercial work over $2,500
FeesApplication fee plus PSI exam fees; $75 renewalApplication fee plus exam; $100 renewal
ExamYes: Class II trade exam plus business and lawYes: general contractor exam (NASCLA accepted)
Experience4 years under a licensed electrical contractorExperience and education set by the board for each tier
RenewalEvery 2 yearsEvery 2 years
Continuing education4 hours a year (8 per renewal)None for commercial general contractors
Required insuranceWorkers' comp if you have employeesGeneral liability and workers' comp proof with the application
ApplyApply ›Apply ›

Some of these figures come from secondary sources or change often, so confirm fees and timelines with the board before you apply. Sources: GA Board of Electrical Contractors FAQ; Ga. Comp. R. & Regs. 553-12 (renewal)

Working directly for a power utility in Georgia

Ch. 14 has not applied to power systems for generating or distributing current built under the NESC by a utility. Chapter 14 was rewritten effective July 1, 2026, so confirm the exemption carried over, and whether line work is a Ch. 41 'general contracting' job.

Official Georgia licensing boards

How to apply in Georgia

Electrical: exam application form 44 (sos.ga.gov forms), 3 references incl. one licensed EC, 4 yrs experience; Class II is unrestricted.

Licensed in another state? See Georgia electrical license reciprocity.

Why licensing matters in Georgia

When you need the license
Before you sign the contract
Penalties for unlicensed work
Georgia's general contractor law makes the contract unenforceable rather than setting a separate fine in that section.
Getting paid
If you contract without a required license, you can't enforce the contract, and you have no lien or bond claim for your labor or materials (O.C.G.A. 43-41-17). You count as unlicensed if you lack the license when the contract is signed or work starts.

Statutes:

Emergency and storm work in Georgia

Waiver in state law

Out of state businesses working on infrastructure for a declared disaster aren't required to meet state or local business licensing or registration requirements or file most state taxes during the disaster period.

Law: O.C.G.A. 48-2-100. Triggered by: Governor or a presidential declaration.

File Georgia DOR Form IT-DN (disaster notification) for the out of state business. Sales, fuel and similar transaction taxes still apply.

Utility line work in Georgia normally needs a contractor/GC license. The disaster law is what lets qualifying out of state crews work without it during the declared period.

Sources: O.C.G.A. 48-2-100 · Georgia DOR Form IT-DN

Compare every state: emergency and storm work licensing by state ›

Who hires overhead distribution crews in Georgia

The largest electric utilities in Georgia by customers: Georgia Power Co (2,804,103 customers); Jackson Electric Member Corp (262,629 customers); Cobb Electric Membership Corp (224,124 customers); Sawnee Electric Membership Corporation (202,144 customers); GreyStone Power Corporation (152,146 customers); Walton Electric Member Corp (142,923 customers). All 97 Georgia utilities ›

Insurance for overhead distribution crews · limits by utility

TAKKEL Insurance SponsoredGet overhead distribution contractor insurance quotes in Georgia
Coverage for overhead distribution crews working in Georgia.
Start a quote ›

Common questions

Do I need a license to do overhead distribution work for a utility in Georgia?
Yes. Overhead distribution work done directly for the electric utility in Georgia requires a contractor/GC license. The utility exemption here isn't settled in the statute text, so confirm with the board before relying on it. Ch. 14 has not applied to power systems for generating or distributing current built under the NESC by a utility. Chapter 14 was rewritten effective July 1, 2026, so confirm the exemption carried over, and whether line work is a Ch. 41 'general contracting' job.
Do I need a license for overhead distribution work that isn't for the utility in Georgia?
Yes. Overhead distribution work done for a customer, developer or other non utility owner in Georgia requires a contractor/GC license and an electrical contractor license.
Which board licenses overhead distribution line contractors in Georgia?
In Georgia, overhead distribution line contractors deal with GA Secretary of State, Professional Licensing (construction boards) and GA Electrical Contractors board rules for state licensing.
How long does a Georgia electrical contractor license last?
The Georgia electrical contractor license renews every 2 years, so put the date on your calendar and renew before it lapses. Continuing education: 4 hours a year (8 per renewal).
How much does a Georgia electrical contractor license cost?
State fees for the electrical contractor license: Application fee plus PSI exam fees; $75 renewal. Bond, insurance and exam vendor fees are extra. Confirm current fees with the board before you apply.
Do out-of-state line crews need a license for storm restoration in Georgia?
Usually not during the declared disaster period. Out of state businesses working on infrastructure for a declared disaster aren't required to meet state or local business licensing or registration requirements or file most state taxes during the disaster period. Trigger: Governor or a presidential declaration. Utility line work in Georgia normally needs a contractor/GC license. The disaster law is what lets qualifying out of state crews work without it during the declared period.

See all 97 electric utilities in Georgia with links to their websites.

Other Georgia work types

Same work type in other states: Overhead Distribution licensing in all 50 states and DC

Statutes and research sources

Research to plan from, not legal advice. Confirm with the Georgia board before bidding.