Other work: Yes: a contractor/GC license.
What's different about New Mexico
- New Mexico's storm work rules come from N.M. Stat. 7-1-83. New Mexico gives out of state disaster workers relief from state tax filing and withholding.
- New Mexico reciprocates only the EE-98J journeyman certificate, from Alaska, Arkansas, Colorado, Idaho, Montana, Nebraska, Oklahoma, South Dakota, Texas and Wyoming.
- Contracting without a license is a misdemeanor: up to 90 days and $300 to $500 for jobs of $5,000 or less, and up to six months and a fine of 10% of the contract value above that (NMSA 60-13-52).
Sources: N.M. Stat. 7-1-83 · NM CID journeyman alert · NMSA 60-13-52 · NMAC 14.6.6.10 (EL-1)
Pick your work type
- Overhead Distribution: Overhead distribution work covers the pole lines that carry power from substations to homes and businesses.
- Overhead Transmission: Overhead transmission work covers the high voltage lines that move power between generating plants and substations.
- Underground Utility: Underground utility work covers buried power distribution.
- Underground and Aerial Fiber: Fiber construction covers aerial work (make ready, strand, lashing fiber to existing poles, splicing) and underground work (directional boring, microtrenching, conduit, handholes and vaults) for broadband and telecom networks.
- Line Clearance and Tree Trimming: Line clearance covers utility vegetation management.
- Substation: Substation work covers the yards where voltage is stepped up or down.
What New Mexico requires
- Contractor / GC license
- CID contractor license, EL-1 Electrical Distribution & Transmission (over 5,000 V); EE-98 for 5,000 V and under.
- Electrical contractor license
- No separate license: electrical is a CID classification.
License quick facts
| Contractor / GC | |
|---|---|
| License class | CID contractor license: EL-1 Electrical Distribution and Transmission (over 5,000 volts) or EE-98 (5,000 volts and under) |
| Fees | $36 application plus classification license fees |
| Exam | Yes: business and law, plus the trade exam for the qualifying party |
| Experience | Qualifying party experience set for each classification |
| Renewal | Every 3 years |
| Continuing education | None for the contractor license |
| Required insurance | $10,000 license bond (or cash or audited financial statement) and a NM tax registration |
| Apply | Apply › |
Fees and rules change, so check the board's site before you apply. Sources: 14.6.3.8 NMAC (bond and qualifying party); PSI New Mexico contractor licensing FAQ
License bond
New Mexico requires a bond for a contractor license ($10,000), and requires a bond for an electrical contractor license ($10,000 (same CID license bond)). New Mexico license bond details ›
Working directly for a power utility
The utility itself is exempt; line contractors (e.g., Quanta's Par Western) hold the CID EL-1 classification to work in NM.
Official New Mexico licensing boards
How to apply in New Mexico
- How to apply: electrical license NM Regulation & Licensing Dept - Construction Industries Division
- How to apply: contractor license or registration NM RLD - Construction Industries Division
Licensing processed by PSI. EL-1 classification covers electrical distribution systems including transmission lines
Electrical license reciprocity in New Mexico
Reciprocity agreements New Mexico reciprocates only the EE-98J journeyman certificate, from Alaska, Arkansas, Colorado, Idaho, Montana, Nebraska, Oklahoma, South Dakota, Texas and Wyoming. New Mexico electrical reciprocity details ›
Why licensing matters in New Mexico
- When you need the license
- Before work starts
- Penalties for unlicensed work
- Contracting without a license is a misdemeanor: up to 90 days and $300 to $500 for jobs of $5,000 or less, and up to six months and a fine of 10% of the contract value above that (NMSA 60-13-52).
- Getting paid
- An unlicensed contractor can't sue to collect compensation and has no right to a mechanic's lien (NMSA 60-13-30).
Statutes:
These rules apply when a license is required. Check the utility exemption above, and see penalties and bid timing in every state.
Emergency and storm work in New Mexico
Partial or case by case
New Mexico gives out of state disaster workers relief from state tax filing and withholding. The law doesn't waive contractor or electrical licensing.
Law: N.M. Stat. 7-1-83. Triggered by: Governor or a presidential declaration.
Line work for a utility may still fall under New Mexico's utility exemption; check the license section on this page.
Utility line work in New Mexico normally needs a contractor/GC license. Unless an emergency order or the board says otherwise, out of state crews need it before they start.
Sources: N.M. Stat. 7-1-83
Compare every state: emergency and storm work licensing by state ›
TAKKEL Insurance SponsoredUtility contractor insurance in New MexicoWorkers' comp, general liability, fleet, equipment and umbrella for distribution, transmission, underground and fiber contractors. Start a quote ›
Co-ops and public power in New Mexico
New Mexico has 20 electric co-ops and 9 city, district or other public power utilities. The largest: City of Farmington, Jemez Mountains Elec Coop, Inc, Kit Carson Electric Coop, Inc, Continental Divide El Coop Inc, Central New Mexico El Coop, Inc. We have vendor registration guides for 1 of them, including Western Area Power Administration (WAPA). Most smaller co-ops keep their own bidder lists, so call their operations or engineering manager.
See every New Mexico co-op and public power utility ›
Utility supplier portals in New Mexico (6)
Where to register as a contractor or supplier with utilities that serve New Mexico: investor owned utilities, public power and co-ops. Each link explains the portal, how registration works and what to have ready.
| Utility | Platform | How to get in |
|---|---|---|
| Basin Electric Power Cooperative | Email introduction | Contact supply chain |
| El Paso Electric | Oracle Fusion Supplier Portal | Paused |
| PNM | Online prospective vendor application | Open form |
| Tri-State | No public vendor portal found | Contact procurement |
| Western Area Power Administration | SAM.gov and FedConnect | Federal registration |
| Southwestern Public Service | Coupa (eSourcing) | Register; events by invite |
Co-ops and city utilities: see every co-op and public power utility in New Mexico.
Electric utilities in New Mexico (32)
Every electric utility that serves customers in New Mexico, grouped by ownership and sorted by number of customers. These are the utilities that hire line, underground and fiber contractors. Names link to the utility's website where we have a working one.
Investor owned utilities (3)
| Utility | Customers | Register to bid |
|---|---|---|
| Public Service Co of NM | 552,638 | Supplier portal › |
| Southwestern Public Service Co | 127,672 | Supplier portal › |
| El Paso Electric Co | 107,384 | Supplier portal › |
Electric cooperatives (20)
| Utility | Customers | Register to bid |
|---|---|---|
| Jemez Mountains Elec Coop, Inc | 31,676 | |
| Kit Carson Electric Coop, Inc | 30,807 | |
| Continental Divide El Coop Inc | 23,382 | |
| Central New Mexico El Coop, Inc | 21,022 | |
| Otero County Electric Coop Inc | 20,582 | |
| Central Valley Elec Coop, Inc | 15,225 | |
| Farmers Electric Coop, Inc | 13,672 | |
| Socorro Electric Coop, Inc | 13,185 | |
| Mora-San Miguel Elec Coop | 11,389 | |
| Lea County Electric Coop, Inc | 11,171 | |
| Roosevelt County Elec Coop Inc | 6,079 | |
| Columbus Electric Coop, Inc | 5,038 | |
| Sierra Electric Coop, Inc | 4,420 | |
| Northern Rio Arriba E Coop Inc | 3,255 | |
| Springer Electric Coop, Inc | 3,084 | |
| Southwestern Electric Coop Inc | 2,140 | |
| Navopache Electric Coop, Inc | 1,707 | |
| Duncan Valley Elec Coop, Inc | 339 | |
| Rio Grande Electric Coop, Inc | 316 | |
| Tri-County Electric Coop, Inc (OK) | 6 |
Municipal and public power utilities (8)
| Utility | Customers | Register to bid |
|---|---|---|
| City of Farmington | 45,107 | |
| Navajo Tribal Utility Authority | 10,914 | |
| City of Gallup | 10,461 | |
| Los Alamos County | 8,581 | |
| Raton Public Service Company | 4,248 | |
| City of Truth or Consequences | 4,070 | |
| City of Aztec | 3,187 | |
| Town of Springer | 692 |
Federal power agencies (1)
| Utility | Customers | Register to bid |
|---|---|---|
| Western Area Power Administration (WAPA) | 4 | Supplier portal › |
Source: U.S. Energy Information Administration, Form EIA-861 (2024 data). Customer counts are for New Mexico only. Website links checked November 2026; 4 of 32 have a working link on file.
Common questions
- How long does a New Mexico electrical contractor license last?
- New Mexico doesn't issue a separate electrical contractor license; electrical and line work falls under the CID contractor license: EL-1 Electrical Distribution and Transmission (over 5,000 volts) or EE-98 (5,000 volts and under). The New Mexico contractor license renews every 3 years, so put the date on your calendar and renew before it lapses. Continuing education: None for the contractor license.
- How much does a New Mexico electrical contractor license cost?
- New Mexico doesn't issue a separate electrical contractor license; electrical and line work falls under the CID contractor license: EL-1 Electrical Distribution and Transmission (over 5,000 volts) or EE-98 (5,000 volts and under). State fees for the contractor license: $36 application plus classification license fees. Bond, insurance and exam vendor fees are extra.
- Do out-of-state line crews need a license for storm restoration in New Mexico?
- It depends. New Mexico gives out of state disaster workers relief from state tax filing and withholding. The law doesn't waive contractor or electrical licensing. Trigger: Governor or a presidential declaration. Utility line work in New Mexico normally needs a contractor/GC license. Unless an emergency order or the board says otherwise, out of state crews need it before they start.
Statutes and research sources
This is research to plan from, not legal advice. Licensing rules change and cities and counties can add their own licenses; every state also expects business registration, workers' comp and tax filings. Confirm with the board before bidding.